01
CONNECTING ENERGY. BELOW THE SURFACE.
Power, laid
to the seabed.
Discuss a campaignSubsea cable installation.
From route survey to lasting protection.
ONE ROUTE. EVERY STAGE.
Explore capabilities From route survey to burial.
THE WHOLE CONNECTIONEvery metre
Every metre
matters.
A cable route is more than a line on a chart.
It is a chain of decisions. Seabed conditions, cable handling, vessel configuration and landfall interfaces all have to work together.
Bring them into one campaign plan, from the early route questions to the final protection requirements.
See the installation approachIllustrative route · engineered for the conditions
THE CAMPAIGN SETS THE CONFIGURATIONVESSELS & EQUIPMENTThe right spread.
The right spread.
For the right route.
Start with the project. Match the vessel and equipment configuration to the cable system, water depth, route and installation window.
Explore vessel planningWHERE CONNECTIONS BEGINDifferent routes.
Explore project scenarios Different routes.
Shared purpose.

Offshore wind export
An export cable campaign connecting offshore generation to the shore.

Island interconnector
Planning a subsea link between an island and a mainland connection.
LET’S PLAN WHAT’S NEXTThe next connection
Discuss a campaign